Deadlines

Due to prefabricated elements, the construction period is short and the moving in is fast. The elements are produced throughout the year regardless of the season. The preparations are performed 2 to 3 months prior to assembling. The construction, up to the prolonged third phase, lasts for a month. Unlike the classic way of building, the RIKO house building system requires no drying and the concluding works last about 4 months whether they are performed during the winter or the summer.